Flood Plain Mitigation
As a part of the drainage design process, regulatory authorities require flood plain mitigation, or compensation for when fill is placed within the flood plain. EEC can work with the developer to design the required basin or provide the required volume within the stormwater pond.
Related Projects
Warehouse Renovation and Site Redesign
EEC provided site engineering and permitting for an existing Manufacturing Warehouse located on 3.45 acres in Tampa.