Project: Utility
EEC completed design and permitting for a new main water at an industrial facility in Oldsmar. The existing facility was required to split water service off from a larger distribution network in the industrial campus. EEC permitted the new water line and oversaw the wet tap and installation of a new backflow, meter, and water line. EEC coordinated a specialized plumbing run in the interior of the facility.