Projects
Site Development
EEC provided site development services for the redevelopment of an existing facility into a new restaurant/bar.
Utility Design
EEC completed design and permitting for a new main water at an industrial facility in Oldsmar.
Barbados
The preserve was being impacted by sewage discharge from a nearby wastewater treatment facility.
Water Works Park Site Assessment and Remediation
EEC performed a Brownfields Assessment and managed remediation efforts in conjunction with the construction of both Water Works and the adjacent restaurant.
Curlew Creek Sedimentation and Engineering Analysis
As part of a legal action, EEC was retained by a marina owner to prepare a report on the sedimentation occurring at the mouth of Curlew Creek.
Industrial Site Assessment and Remediation
EEC has been working on the environmental impacts and concerns of the manufacturing property dating back to the late 1980’s.
Citrus Processing Upgrades
A citrus processing facility retained Environmental Engineering Consultants to review existing operational data of an Industrial Wastewater Treatment Plant in central Florida.
Concrete Batch Plant Expansion
This project involved an existing Concrete Block Facility which wished to expand their ready-mix batching capabilities. EEC designed a 5 acre tract of land in Tampa as a concrete block plant in 2005- 2007.
Groundwater Remediation of Manufacturing Site
EEC worked on a walled recharge basin and Ground Water Remediation System were designed to assist in the remediation process of the site.
Warehouse Renovation and Site Redesign
EEC provided site engineering and permitting for an existing Manufacturing Warehouse located on 3.45 acres in Tampa.
Manatee Industrial Park
EEC was contracted to perform testing on a former fish farm property located south of the Manatee County – Hillsborough County Line, near Port Manatee.
City of Tampa Waterworks
Environmental Engineering Consultants was contracted to perform an environmental study of Water Works Park, located just north of downtown Tampa.
Eastwood Estates Mobile Home Park
This project required a wastewater connection to Hillsborough County’s Collection System. An existing mobile home park with 160 mobile homes.
Graeme Hall Nature Sanctuary
In 2010 the principals of Graeme Hall Nature Sanctuary in Barbados required a sophisticated and in-depth rapid assessment of the biological health of the Graeme Hall.
Indoor Air Quality
EEC has worked on Chinese Drywall Projects where we performed air clearance sampling on homes that were known to have previously contained Chinese Drywall.
Site Design/Industrial Air Test/Wastewater
EEC was retained to provide site engineering plans and permitting for a small strip center within the City of Tampa.
Environmental Assessments
EEC was retained to provide site Engineering Plans and Permitting for a Small Strip Center within the City of Tampa’s Limits.